Proyecto Puente a Bend
Ganancias del río
Restaurar los procesos naturales de los ríos, reducir los riesgos de inundaciones y mejorar los hábitats de la vida silvestre y la salud a largo plazo.
Fogonadura
Proyecto Big Wood
Distrito de control de inundaciones
Fideicomiso de tierras del río Wood
Costo
$500,000
Fondos
Dependemos de donaciones o subvenciones privadas para financiar todas las iniciativas del Proyecto Big Wood.
Únete a la causa. Sé el efecto.
Why Gimlet?
Below Gimlet Bridge, the Big Wood River is proving to be more unpredictable than official maps suggest, endangering homes on both sides during significant floods. Here, over 40% of the riverbanks are lined with riprap, a rugged defense against erosion. Yet, the 2023 flood saw 48 homes either ordered to evacuate or placed on high alert. Since the 2017 floods, the river’s path has become increasingly restless, eroding the land and heightening risks in developed areas. As sediment continues to be carried downstream from adjustments made upstream, we face the looming challenge of further floods and evolving hazards, underscoring the urgent need for thoughtful conservation and restoration efforts.
What is the Bridge to Bend Project?
This project is currently in the early design phase, where experts are crafting solutions to address the upstream issues affecting the river. These include the impacts of channelization, sediment build-up, frequent floods, and diminished wildlife and fish habitats. The plan proposes innovative solutions such as removing or modifying hardened banks, reconnecting old side channels, adding engineered log jams, and creating areas to trap sediment. These steps are aimed at restoring the river’s natural balance and enhancing its vitality for all its inhabitants.
Partnership with The Flood Control District and The Wood River Land Trust
Project Big Wood, The Flood Control District and The Wood River Land Trust have joined forces to create the Bridge to Bend Committee as equal partners in this important restoration project.
Outcomes:
-
Restored River Dynamics: By removing hardened banks and reconnecting old side channels, the river will regain its natural flow patterns, reducing sediment build-up and improving overall river health.
-
Reduced Flood Risk: Innovative treatments, such as engineered log jams and sediment retention areas, will help manage floodwaters more effectively, lowering the risk of flooding in nearby areas.
-
Enhanced Wildlife and Fish Habitats: The project will improve the conditions for local wildlife and fish by creating diverse and healthy habitats, supporting a thriving ecosystem.
-
Improved Sediment Management: Strategic placement of sediment retention areas will help manage sediment more effectively, preventing excessive build-up and maintaining river clarity.
-
Long-Term Ecological Benefits: These actions will support the river's natural processes, leading to long-lasting ecological benefits and a more resilient river system.
We need you:
-
Please submit your observations to our EcoWatch page, including the insects you see when recreating on the Big Wood.
-
Whether you are a passionate angler, a concerned community member, or someone who cares deeply about preserving the heart of our valley, let us know if you'd like to volunteer by emailing mendit@projectbigwood.org.
-